View Full Version : PVC or Schedule 40 Pilings?
Frank
04-09-2007, 05:13 PM
Hey Guys,
Anybody ever use PVC or schedule 40 for pilings? I see them used in creeks and some back bays but didn't know if they were sturdy enough. It seems to make sense that with a mud bottom you could have more stability than a wood piling because the mud could anchor from the inside of the piling also. I've seen as little as 3-4 inch PVC pipe anchoring pretty large docks on some creeks....I don't know if the current was strong.
Any thoughts?
Much appreciated.
Frank
Mike Hammer
04-09-2007, 09:17 PM
I would think they would have to be filled with reinforced concrete to have any strength. We use sch 80 pvc for different piping applications and it isn't that strong.
1 in the bag
04-09-2007, 09:32 PM
we use 3 inch galv pipe for low docks for crew team. works well in strong current. pvc breaks to easy ,leaving a hazzard.
Frank
04-10-2007, 07:00 PM
thanks for the reply guys (Mike and 1 in)....still not sure why they do it.....but it sure looks a lot easier to put in....
1 in the bag...all three of my kids used to row on the Schuylkill for their high school.. you a rower?
Thanks,
Frank
Hey Guys,
Anybody ever use PVC or schedule 40 for pilings? I see them used in creeks and some back bays but didn't know if they were sturdy enough. It seems to make sense that with a mud bottom you could have more stability than a wood piling because the mud could anchor from the inside of the piling also. I've seen as little as 3-4 inch PVC pipe anchoring pretty large docks on some creeks....I don't know if the current was strong.
Any thoughts?
Much appreciated.
Frank
Go with a 4" pipe then find the next size down and it will slide up into the 4" pipe. Double walled will make them lots stiffer. Coat the smaller one with 5200 before you slide them together. Once that stuff binds them together you won't believe how stiff they will be.
Then go rent a 3-5hp 2" pump at a rental joint. Figure a way to connect the pump hose to the end of the PVC pipe and jet them in to whatever depth you want..
High Wire
04-10-2007, 07:17 PM
Go with a 4" pipe then find the next size down and it will slide up into the 4" pipe. Double walled will make them lots stiffer. Coat the smaller one with 5200 before you slide them together. Once that stuff binds them together you won't believe how stiff they will be.
Then go rent a 3-5hp 2" pump at a rental joint. Figure a way to connect the pump hose to the end of the PVC pipe and jet them in to whatever depth you want..Neet stuff!
1 in the bag
04-10-2007, 08:01 PM
No im not Frank,i help with the dock{work for the city of ocean city}
phish4fun
04-10-2007, 08:31 PM
just a heads up pvc prices will jump tomorrow as well as copper and galvanized pipe.
Frank
04-11-2007, 08:07 PM
Thanks for all you help boys...time to put the docks in the next week or so...this will be my first time doing and I have some help. going to give the schedule 40 a try. If the neighbors are using it...they must know something...Picking up 2x 20ft lengths in Bridgeton in a week or so. It ain't cheap...
thanks again all,
Frank
HookinUp
04-12-2007, 03:26 PM
Hey Guys,
Anybody ever use PVC or schedule 40 for pilings? I see them used in creeks and some back bays but didn't know if they were sturdy enough. It seems to make sense that with a mud bottom you could have more stability than a wood piling because the mud could anchor from the inside of the piling also. I've seen as little as 3-4 inch PVC pipe anchoring pretty large docks on some creeks....I don't know if the current was strong.
Any thoughts?
Much appreciated.
Frank
Not sure if I've ever seen pvc schedule 40 used for pilings??
I know that now the epa makes you use vinyl coated pilings and bulkheads around clam and oyster bed areas.
They don't want any of the chemical treated lumber used on bulkheads where the chemicals can leach out into the beds
GRANDSLAMSAM
04-13-2007, 09:54 PM
I have two sport port floating docks for two heavy 900# each jet skis. I was skeptical when the manufacturer said to use a 4 inch sch 40 pvc pipe in each corner as pilings. After 4 seasons in pretty rough conditions (exposed to the open bay) I have not had any problems. I think the suggestion to put a pipe in a pipe with 5200 would work if you have a heavier boat.
ReelQuick
04-13-2007, 10:20 PM
P4 fun,yo criss,#1 wire was at 3$ a pound yeterday.This was a good post for me being the first slip at D -dock,I got one shot at getting in,after that...well you know.Painting the bottom this week,if we don`t get snow.Hope to be down in 2 weeks.
EddieB
04-15-2007, 05:32 PM
We used 4" pvc on one of our docks. We put caps on the bottom end and pured a bag of sac crete in the pipe for weight. Then jetted them into desired depth. Filled the rest of the way up with sac crete. Still going strong after two years and should last a good while longer.
captainaaron
04-15-2007, 06:39 PM
i would not use pvc for a piling after a few years the sun will destroy the pvc it is not uv protected and if we get a good icing the pvc does not stand a chance against a 100# iceburg
SWisH
04-15-2007, 09:05 PM
Two of my neighbors have slid PVC over their wood pilings to extend the height of their pilings to deal with the occassional extra high tide. In both cases, they are using the PVC to keep their boats off of the docks.
wired98
04-15-2007, 09:28 PM
Swish thats what i thought they were PVC slid over wood pilings they have a few at Sportsmans.
Powered by vBulletin® Version 4.2.0 Copyright © 2013 vBulletin Solutions, Inc. All rights reserved.