Read in the Press this morning that DOT saved NJ Taxpayers $102 million in changes to the Rt. 52 Causeway plan. That's a good thing, but the one item that stood out was they scraped a complicated offramp system that would allow access to the fishing piers they had plan. Does this mean they have eliminated the fishing piers they had originally planned?
 

·
Registered
Joined
·
1,126 Posts
Once they start dredging its gonna be years til that place is remotely the same. Shame I like the various channels up there in the spring and fall.
 

·
Registered
Joined
·
2,433 Posts
I hope not, I'll have to drive alot further at night in my boat:( I'll check and see Mon when I get to work. It still wont be good since there plan is to put the lights in the middle of the bridges. Things will def change and not for the good.
 

·
Registered
Joined
·
1,008 Posts
The way I read the article, the redesign eliminates teh elevated portion of the roadway between the bridges. That is what allowed them to eliminate teh ramps to the fishing areas, also they were allowed a materials change.
 