I need the follow 7 items completed in the next 45 days so the boat is ready before spring. I can have her transported to most yards in NJ.
Sailboat - Marshall 22', 1986, 10' wide, Name: Sturdy Turtle
Powered by the original 2GM Yanmar
1 -Replace 2 sea-cocks - raw-water inlet for engine and sink drain in cabin - both are easy to get to.
2- Trans slips under load over 2,200 rmps - rebuild trans fix and/or pull out and I'll drop off at Mack Boring and have you install the rebuild.
3- Replace 4 fixed portlights - I have the rough cut lexan from Marshall - needs to be installed correctly with orginal Bronze bolt together trim.
4 - Replace bilge pump in engine area
5- Paint cabin sole (2 coats) - I have the paint
6- Paint cocpit sole (2 coats) - Same paint as # 5
7- Sand as needed as apply (2 coats) of Cetol to all exterior teak trim.
Looking for an estimate itemized price for this work - again I'm looking to have this work done in the next 45 days. It is important to know how soon the work can be performed. Also if unable to complete the paint work (# 5, 6, and 7 above) this time of year I will do it when all other work is complete.
Thanks in advance for the recomendations.
All the best,
Chris Mele
Cell 908 962 2289 - any time
Sailboat - Marshall 22', 1986, 10' wide, Name: Sturdy Turtle
Powered by the original 2GM Yanmar
1 -Replace 2 sea-cocks - raw-water inlet for engine and sink drain in cabin - both are easy to get to.
2- Trans slips under load over 2,200 rmps - rebuild trans fix and/or pull out and I'll drop off at Mack Boring and have you install the rebuild.
3- Replace 4 fixed portlights - I have the rough cut lexan from Marshall - needs to be installed correctly with orginal Bronze bolt together trim.
4 - Replace bilge pump in engine area
5- Paint cabin sole (2 coats) - I have the paint
6- Paint cocpit sole (2 coats) - Same paint as # 5
7- Sand as needed as apply (2 coats) of Cetol to all exterior teak trim.
Looking for an estimate itemized price for this work - again I'm looking to have this work done in the next 45 days. It is important to know how soon the work can be performed. Also if unable to complete the paint work (# 5, 6, and 7 above) this time of year I will do it when all other work is complete.
Thanks in advance for the recomendations.
All the best,
Chris Mele
Cell 908 962 2289 - any time